Customer Background
An emerging robotics company with annual production capacity of 50,000 units.
Core Challenges
The schedule was tight, the workload was heavy, and the rubber covering needed strong wear resistance and anti-slip performance.
Common Supplier Limitations
Many suppliers needed around four weeks and could not balance fast delivery with the required covering performance.
Tede Custom Solution
Tede added equipment capacity and arranged dedicated operators for turning, rubber covering, outer diameter machining, trimming, inspection and packing.
Result
The team completed up to 800 pieces per day and delivered the batch in 10 days.